CONSTRUCTION TECHNIQUES OF CEILING & SUNSHADE MATERIALS

Are you wondering how the construction technique of Ceiling and Sunshade materials will take place? What criteria need to be met for the completed project to achieve the best quality? Your concerns will be relieved after you refer to the article below!

Ceiling and Sunshade materials have high applicability in construction

1. Why should you choose Ceiling and Sunshade materials for construction?

Most every architectural project is indispensable for the design and construction of the Ceiling and Sunshade system. These are both familiar construction materials (items, not materials) in the process of completing projects. The reason is because it creates an ideal living space, ensuring safety and aesthetic perfection.

With its own functions, Ceiling and Sunshade have been doing their job well with high applicability and can be installed using many different materials. The most prominent is the Aluminum Ceiling and Sunshade material with its own advantages that many investors use.

To create a stable Ceiling and Sunshade system with a sustainable structure requires proper construction techniques carried out by a team of highly skilled workers with architectural expertise and practical experience.

2. Construction techniques for aluminum ceiling materials

Installing an aluminum ceiling system is relatively simple, with short construction time but requires correct techniques with all the following steps.

2.1. Prepare

Before starting to install the ceiling, workers need to prepare and check to see if they have all the necessary tools and equipment. Make sure to have the following items:

– Hats, protective shoes

– Safety strap according to regulations (used for installation areas requiring height).

– Construction tool set (electrical socket, drill, screwdriver, ...)

– Aluminum ceiling system

– Necessary accompanying aluminum ceiling accessories such as: mounting brackets, hanging steel wire, hangers, ceiling moldings, ...

– The card allows access to the construction site according to regulations.

2.2. Construction process

After fully checking the materials and receiving approval from the investor, you can proceed with construction.

Step 1: Preparation and location determination

Conduct construction scaffolding, use a surveying machine to determine the ceiling height and ink on the wall according to the designed ceiling height.

Our staff performs measurements according to the parameters provided in the design

Step 2: Install V border on the wall

Fix the V-bar wall border. Depending on the type of wall used, we will drill or use a nail hammer to fix the wall border bar to the wall.

In addition, depending on the wall, you will need to fix the appropriate distance between the nail holes or drill holes, but make sure it is not more than 300mm. In particular, the allowable error when fixing the wall border bar is ±4mm.

Step 3: Locate bare bones

Choose the direction of the bone bar consistent with the direction of the hanging point layout. Accordingly, the distance between the bars according to the structural drawing of the aluminum ceiling has been approved by the investor.

Step 4: Install the hanging rod

Drill to position the expansion bolts to the ceiling position. The maximum allowable distance between tie suspension points is 1200mm. The distance from the wall to the first hanging point is 610mm. All hanging points will be drilled directly into the reinforced concrete floor with an 8mm drill bit as well as connected by Pat, expansion jack or bullet jack or explosive bullet jack (depending on the type of frame).

Step 5: Install bare bones

Fix the bone bar to the stem points and connect it to the threaded stem with 2 M6 nuts (nuts) locked on the threaded rod. Next, lock the bar and hanger tightly with the M6 bolt tool.

Step 6: Align the bare bones

After complete installation, the team of workers need to adjust the frame so that it is neat and the frame surface is flat. Thoroughly check the pitch for accuracy with a laser machine.

Step 7: Install ceiling panels

The ceiling panel installation process is completed after the skeleton level has been approved.

The aluminum ceiling system is solid and sturdy after being carefully machined

2.3. Note on installation

– The installation location of the aluminum ceiling system should be careful not to be too high.

– Ensure adequate supply of materials for technicians to perform construction safely and quickly.

– Priority should be given to choosing high-quality aluminum material to improve the quality of the project.

– Follow proper procedures and standard regulations.

– Check technical drawings and actual survey before starting.

3. Construction techniques for aluminum Sunshade materials

The trend of installing aluminum barriers in buildings, hospitals, schools, shopping centers, etc. is becoming increasingly popular.

The product is cast from aluminum alloy with effective sun blocking and light directing properties to help innovate architectural style.

Properly constructing aluminum Sunshade helps you feel secure about the durability of the project as well as ensuring safety during long-term use.

3.1. Construction instructions

Step 1: Choose the ideal type of aluminum Sunshade according to the design and spec of the project.

Step 2: Preparation work: Install scaffolding, use a surveying machine to determine the correct elevation and ink on the wall according to the updated elevation in the drawing.

Step 3: Install the support frame system.

Step 4: Adjust the skeleton system to the correct height according to the regulatory requirements.

Step 5: Install finished aluminum Sunshade.

Aluminum Sunshade are installed in modern buildings as well as townhouses with many interesting functions

3.2. Require technical standards

– The distance between the bars must be even.

– Screw hole plugs need to be fully filled and filled with cream for the screw caps installed at the bottom edge of the bar.

Construction of the Aluminum Ceiling & Sunshade system is not too complicated but it requires professional and methodical techniques. If you are looking for an experienced construction unit, please contact Top American Corporation for 24/7 service!